|
Pool Opening |
Pool Maintenance |
Pool Closing |
Liner Replacement |
Pool Consulting |
Chemicals & Accessories |
Pool Repair

Inground Pool Opening Process
- Remove the pool cover.
- MESH COVER - Fold the cover, place in its bag, and set aside to dry.
WATER TUBE COVER - Rinse the cover, empty water tubes, and fold cover and water tubes.
- Remove all winterizing plugs and gizmos.
- Brush down walls and steps.
- Lightly vacuum the pool bottom, to remove sediment.
- Perform a preliminary water analysis.
- MESH COVER - Drain the pool water, to the proper level.
WATER TUBE COVER - Add water, to the proper level.
- Clean the steps and skimmer with the proper cleansing solution.
- Reinstall the skimmer baskets, eyeballs, handrails, and ladders.
- Reconnect and start the filter system and heater. (Lighting the pilot, if applicable)
- Add the start-up chemicals.
- Place the solar cover onto the reel.
- Hose down the deck area.
- OPTIONAL - We can deliver your year's supply of pool chemicals the day of your pool opening, at a 10% discount.
|